2). Check the power cable of warehouse goods lift.
Check whether the cable insulation layer is damaged; whether the cable is fixed reliably; whether the cable stretched part is bent or twisted. Machine damage: check whether the cable connection is firm.
3). Check the distribution box of warehouse goods lift
Check whether the power distribution box shell is damaged and the paint is damaged; check whether the safety warning signs of the power distribution box are intact; check whether the power distribution box is grounded firmly and reliably; the hydraulic lift conducts a comprehensive inspection of the contractor: contact whether the burn is serious, whether there is a gap in the contact contact, whether the spring is damaged, deformed, corroded, and fatigue aging, whether there is any adhesion on the suction surface of the iron core, whether there is rust, whether there is oil, and the contractor when working, There is an abnormal sound, the limit block has no obvious wear machine damage; whether the disconnection time is normal; time relay inspection content: check whether the wiring in the panel is firm, whether there is looseness or fall off: check whether there is dust or dirt in the panel.
4).Running
After the small cargo lift is installed, it can be operated. The surface of the counter is placed according to the approved lifting (the goods are placed on platform above) carry out the increase and decrease operation, and the fund allocation can be used without any problem if the operation is no problem.
Use the column square steel pipe and the internal thread to accurately position, install the four columns and then use the screw nut to quickly; then use the auxiliary chuck
Establish the position of the structure, and weld the three structures and the column; accurately position the manufactured elevator angle steel embedded guide rail
In the groove of the shaft, use the top screw nut to clamp the guide rail and the frame for butt welding; in advance, the cement block and the rack are twisted with anchor screws
Tighten, fix the rack on the rack positioning pin according to the pin holes on both sides of the rack, clamp it with the top screw nut, and then connect it with the
Tightened cement blocks are butt welded to the structure. After checking the accuracy of the specifications and models of the electric lifting platform, arc welding on each part.
In fact, for commercial lifts elevators, as a manufacturer, we are most concerned about the quality of the elevator, and more importantly, the safety. Because large equipment such as commercial lifts elevators can carry people and goods, the load and lift are very large.